Please enable JavaScript to view this site.

ActiveCampaign Forums

Navigation: Schema: V3 > Tables

Pipelines: ActiveCampaign Pipelines

Catalog: ActiveCampaign

Schema: V3

Primary Keys: id

Label: Pipelines

Can retrieve data and change data using insert, update and delete.

Table Columns

The columns of the table Pipelines are shown below. Each column has an SQL data type. A new non-null value must be provided for every required column at all times during insert and update.

Name

Data Type

Label

Required

Documentation

allgroups

int64

 

 

allusers

int64

 

 

autoassign

int64

Auto-assign

 

cdate

datetime

Created

 

currency

string

Currency

 

id

int64

ID

 

title

string

Title

 

udate

datetime

Last Updated

 

 

22-12-2022 20:43 Version 22.1.101-BETA+3681

X

Important Safety and Usage Information

Intended Use and Limitations: This software, developed by Invantive, is designed to support a variety of business and information technology data processing functions, such as accounting, financial reporting an sales reporting. It is important to note that this software is not designed, tested, or approved for use in environments where malfunction or failure could lead to life-threatening situations or severe physical or environmental damage. This includes, but is not limited to:

  • Nuclear facilities: The software should not be used for operations or functions related to the control, maintenance, or operation of nuclear facilities.
  • Defense and Military Applications: This software is not suitable for use in defense-related applications, including but not limited to weaponry control, military strategy planning, or any other aspects of national defense.
  • Aviation: The software is not intended for use in the operation, navigation, or communication systems of any aircraft or air traffic control environments.
  • Healthcare and Medicine Production: This software should not be utilized for medical device operation, patient data analysis for critical health decisions, pharmaceutical production, or medical research where its failure or malfunction could impact patient health.
  • Chemical and Hazardous Material Handling: This software is not intended for the management, control, or operational aspects of chemical plants or hazardous material handling facilities. Any malfunction in software used in these settings could result in dangerous chemical spills, explosions, or environmental disasters.
  • Transportation and Traffic Control Systems: The software should not be used for the control, operation, or management of transportation systems, including railway signal controls, subway systems, or traffic light management. Malfunctions in such critical systems could lead to severe accidents and endanger public safety.
  • Energy Grid and Utility Control Systems: This software is not designed for the control or operation of energy grid systems, including electrical substations, renewable energy control systems, or water utility control systems. The failure of software in these areas could lead to significant power outages, water supply disruptions, or other public utility failures, potentially endangering communities and causing extensive damage.
  • Other High-Risk Environments: Any other critical infrastructure and environments where a failure of the software could result in significant harm to individuals or the environment.

User Responsibility: Users must ensure that they understand the intended use of the software and refrain from deploying it in any setting that falls outside of its designed purpose. It is the responsibility of the user to assess the suitability of the software for their intended application, especially in any scenarios that might pose a risk to life, health, or the environment.

Disclaimer of Liability: Invantive disclaims any responsibility for damage, injury, or legal consequences resulting from the use or misuse of this software in prohibited or unintended applications.

  
Disclaimer