Example Participation Roles

Persons participating in a project could have multiple roles assigned. The same role can be assigned to several people. Examples of participation roles are:

Participation Role Code

Participation Role Limit

Participation Role Description

Task Owner

0

Task Owner

Task Reporter

0

Task Reporter

Task Increaser

0

Task Increaser

Task Modifier

0

Task Modifier

Task Hour Writer

0

Task Hour Writer

Project Increaser

0

Project Increaser

Project Modifier

0

Project Modifier

Project Hour Writer

0

Project Hour Writer

Project Filler

0

Project Filler

Project developer

0

Project developer

Project Product Group Director

0

Project Product Group Director

Project Controller

0

Project Controller

Project Administrator

0

Project Administrator

Project Approver Hours

0

Project Approver Hours

Project Plan Developer

0

Project Plan Developer

Task Email Receiver

0

Task Email Receiver

Project Email Receiver

0

Project Email Receiver

Project Email Sender

0

Project Email Sender

Project Email Copy

0

Project Email Copy

Project Email Bcc

0

Project Email Bcc

Task Email Sender

0

Task Email Sender

Task Email Copy

0

Task Email Copy

Appr. Assign. Std PO

10000

Approving Assignment standard process PO

Appr. Assign. Std Dir.

100000

Approving Assignment standard process Director

Document Author

0

Document Author

Document Reviewer

0

Document Reviewer

Document Target Group

0

Document Target Group

Document Email Receiver

0

Document Email Receiver

Document Email Sender

0

Document Email Sender

Document Email Copy

0

Document Email Copy

Document Email Bcc

0

Document Email Bcc

Organization Employee

0

Organization Employee

Organization. Prim CP

0

Organization Prim CP

Organization-purchasing CP

0

Organization-purchasing CP

Organization Preferred Mechanic CP

0

Organization Preferred Mechanic CP

Organization Preferred Mechanic

0

Organization Preferred Mechanic

Organization Preferred Mechanic 1

0

Organization Preferred Mechanic 1

Organization Preferred Mechanic 2

0

Organization Preferred Mechanic 2

Participation roles can be edited in the screen Participation roles.

X

Important Safety and Usage Information

Intended Use and Limitations: This software, developed by Invantive, is designed to support a variety of business and information technology data processing functions, such as accounting, financial reporting an sales reporting. It is important to note that this software is not designed, tested, or approved for use in environments where malfunction or failure could lead to life-threatening situations or severe physical or environmental damage. This includes, but is not limited to:

  • Nuclear facilities: The software should not be used for operations or functions related to the control, maintenance, or operation of nuclear facilities.
  • Defense and Military Applications: This software is not suitable for use in defense-related applications, including but not limited to weaponry control, military strategy planning, or any other aspects of national defense.
  • Aviation: The software is not intended for use in the operation, navigation, or communication systems of any aircraft or air traffic control environments.
  • Healthcare and Medicine Production: This software should not be utilized for medical device operation, patient data analysis for critical health decisions, pharmaceutical production, or medical research where its failure or malfunction could impact patient health.
  • Chemical and Hazardous Material Handling: This software is not intended for the management, control, or operational aspects of chemical plants or hazardous material handling facilities. Any malfunction in software used in these settings could result in dangerous chemical spills, explosions, or environmental disasters.
  • Transportation and Traffic Control Systems: The software should not be used for the control, operation, or management of transportation systems, including railway signal controls, subway systems, or traffic light management. Malfunctions in such critical systems could lead to severe accidents and endanger public safety.
  • Energy Grid and Utility Control Systems: This software is not designed for the control or operation of energy grid systems, including electrical substations, renewable energy control systems, or water utility control systems. The failure of software in these areas could lead to significant power outages, water supply disruptions, or other public utility failures, potentially endangering communities and causing extensive damage.
  • Other High-Risk Environments: Any other critical infrastructure and environments where a failure of the software could result in significant harm to individuals or the environment.

User Responsibility: Users must ensure that they understand the intended use of the software and refrain from deploying it in any setting that falls outside of its designed purpose. It is the responsibility of the user to assess the suitability of the software for their intended application, especially in any scenarios that might pose a risk to life, health, or the environment.

Disclaimer of Liability: Invantive disclaims any responsibility for damage, injury, or legal consequences resulting from the use or misuse of this software in prohibited or unintended applications.

  
Disclaimer