Contract Budgets

In this screen you can register and change Contract Budgets.Open screen in browser Open Form

A contract budget is a specification of the total available budget for a cost type. You can allocate different budgets to different contracts within a cost category and in this way you will be able, as early as possible, to examine budget exceeding.

Contract budgets can only be registered for cost types from the master roll up category ‘Costs’. You can't use contract budgets for ‘Revenues’ and ‘Results’.

For example: you have a budget of EUR 500,000 for the purchase of five to be demolished homes. Per home you have created a contract in the cost category ‘Purchase houses’, with for each home a contract budget of EUR 100.000. After the negotiations with the first resident you know that you need to pay EUR 120,000 for this house. Therefore, you will determine an order of EUR 120,000 already. Although negotiations with the other residents have not been completed, you can already see a budget exceeding of EUR 20,000.

Contract Budgets from a contract on a project screen

The meaning of the entry fields is:

Project

The project of which the contract budget is part of.

Cost Type

The cost category at which the contract budget is registered. Only cost categories can be chosen from the master roll up of the type ‘Costs’.

Contract

The contract where the contract budget is related to.

Contract Budget

The specific amount for this contract.

Release Deviation

If checked, any budget surplus on this contract budget is used to offset deficits elsewhere.

Explanation

An informative explanation such as the reason for the creation of a specific contract budget.

Documents

Linked documents, see Linking Documents.

Expected Maturity

The date the cash flow for this contract budget is expected to begin.

Expected Maturity End

The date the cash flow for this contract budget is expected to end. The maturity date is only relevant if the cash flow projection method needs it.

Distribution Method

The method used to distribute the cash flow of the revenue over time based on expected maturity and expected maturity date.

The meaning of the other fields:

Unallocated Budget on Cost Category

Current budget space for this cost category.

Size

Size of the linked documents.

X

Important Safety and Usage Information

Intended Use and Limitations: This software, developed by Invantive, is designed to support a variety of business and information technology data processing functions, such as accounting, financial reporting an sales reporting. It is important to note that this software is not designed, tested, or approved for use in environments where malfunction or failure could lead to life-threatening situations or severe physical or environmental damage. This includes, but is not limited to:

  • Nuclear facilities: The software should not be used for operations or functions related to the control, maintenance, or operation of nuclear facilities.
  • Defense and Military Applications: This software is not suitable for use in defense-related applications, including but not limited to weaponry control, military strategy planning, or any other aspects of national defense.
  • Aviation: The software is not intended for use in the operation, navigation, or communication systems of any aircraft or air traffic control environments.
  • Healthcare and Medicine Production: This software should not be utilized for medical device operation, patient data analysis for critical health decisions, pharmaceutical production, or medical research where its failure or malfunction could impact patient health.
  • Chemical and Hazardous Material Handling: This software is not intended for the management, control, or operational aspects of chemical plants or hazardous material handling facilities. Any malfunction in software used in these settings could result in dangerous chemical spills, explosions, or environmental disasters.
  • Transportation and Traffic Control Systems: The software should not be used for the control, operation, or management of transportation systems, including railway signal controls, subway systems, or traffic light management. Malfunctions in such critical systems could lead to severe accidents and endanger public safety.
  • Energy Grid and Utility Control Systems: This software is not designed for the control or operation of energy grid systems, including electrical substations, renewable energy control systems, or water utility control systems. The failure of software in these areas could lead to significant power outages, water supply disruptions, or other public utility failures, potentially endangering communities and causing extensive damage.
  • Other High-Risk Environments: Any other critical infrastructure and environments where a failure of the software could result in significant harm to individuals or the environment.

User Responsibility: Users must ensure that they understand the intended use of the software and refrain from deploying it in any setting that falls outside of its designed purpose. It is the responsibility of the user to assess the suitability of the software for their intended application, especially in any scenarios that might pose a risk to life, health, or the environment.

Disclaimer of Liability: Invantive disclaims any responsibility for damage, injury, or legal consequences resulting from the use or misuse of this software in prohibited or unintended applications.

  
Disclaimer