Please enable JavaScript to view this site.

Made in EU
Odoo Forums

Navigation: Schema: mrp > Tables

workcenter

Work Center

Catalog: Odoo

Schema: mrp

The data in this table is partitioned per value of the column.

This is a read-only table. The Odoo API may not support changing the data or the Invantive SQL driver for Odoo does not cover it. In the latter case, please use the table NativePlatformScalarRequests to upload data to the Odoo API.

Table Columns

The columns of the table workcenter are shown below. Each column has an SQL data type.

Name

Data Type

Label

Required

Documentation

active

boolean

Active

If the active field is set to False, it will allow you to hide the resource record without removing it.

alternative_workcenter_ids

string

 

Alternative workcenters that can be substituted to this one in order to dispatch production

blocked_time

decimal

Blocked Time

Blocked hours over the last month

capacity_ids

string

 

Specific number of pieces that can be produced in parallel per product.

code

string

Code

 

color

int32

Color

 

company_id_label

string

 

 

company_id

string

 

 

costs_hour_account_id_label

string

 

Posts analytical accounting entries in real time for both component and operational costs.

costs_hour_account_id

string

 

Posts analytical accounting entries in real time for both component and operational costs.

costs_hour

decimal

Cost per hour

Hourly processing cost.

create_date

datetime

Created on

 

create_uid_label

string

 

 

create_uid

string

 

 

currency_id_label

string

 

 

currency_id

string

 

 

default_capacity

decimal

Capacity

Default number of pieces (in product UoM) that can be produced in parallel (at the same time) at this work center. For example: the capacity is 5 and you need to produce 10 units, then the operation time listed on the BOM will be multiplied by two. However, note that both time before and after production will only be counted once.

display_name

string

Display Name

 

has_routing_lines

boolean

Has Routing Lines

Technical field for workcenter views

id

int32

ID

 

name

string

Work Center

 

note

string

Description

 

oee_target

decimal

OEE Target

Overall Effective Efficiency Target in percentage

oee

decimal

Oee

Overall Equipment Effectiveness, based on the last month

order_ids

string

 

 

performance

int32

Performance

Performance over the last month

productive_time

decimal

Productive Time

Productive hours over the last month

resource_calendar_id_label

string

 

 

resource_calendar_id

string

 

 

resource_id_label

string

 

 

resource_id

string

 

 

routing_line_ids

string

 

 

sequence

int32

Sequence

Gives the sequence order when displaying a list of work centers.

tag_ids

string

 

 

time_efficiency

decimal

Time Efficiency

This field is used to calculate the expected duration of a work order at this work center. For example, if a work order takes one hour and the efficiency factor is 100%, then the expected duration will be one hour. If the efficiency factor is 200%, however the expected duration will be 30 minutes.

time_ids

string

 

 

time_start

decimal

Setup Time

 

time_stop

decimal

Cleanup Time

 

tz

string

Timezone

This field is used in order to define in which timezone the resources will work.

workcenter_load

decimal

Work Center Load

 

working_state

string

Workcenter Status

 

workorder_count

int32

# Work Orders

 

workorder_late_count

int32

Total Late Orders

 

workorder_pending_count

int32

Total Pending Orders

 

workorder_progress_count

int32

Total Running Orders

 

workorder_ready_count

int32

# Read Work Orders

 

write_date

datetime

Last Updated on

 

write_uid_label

string

 

 

write_uid

string

 

 

 

01-03-2023 15:29 Version 22.1.135-BETA+3826

X

Important Safety and Usage Information

Intended Use and Limitations: This software, developed by Invantive, is designed to support a variety of business and information technology data processing functions, such as accounting, financial reporting an sales reporting. It is important to note that this software is not designed, tested, or approved for use in environments where malfunction or failure could lead to life-threatening situations or severe physical or environmental damage. This includes, but is not limited to:

  • Nuclear facilities: The software should not be used for operations or functions related to the control, maintenance, or operation of nuclear facilities.
  • Defense and Military Applications: This software is not suitable for use in defense-related applications, including but not limited to weaponry control, military strategy planning, or any other aspects of national defense.
  • Aviation: The software is not intended for use in the operation, navigation, or communication systems of any aircraft or air traffic control environments.
  • Healthcare and Medicine Production: This software should not be utilized for medical device operation, patient data analysis for critical health decisions, pharmaceutical production, or medical research where its failure or malfunction could impact patient health.
  • Chemical and Hazardous Material Handling: This software is not intended for the management, control, or operational aspects of chemical plants or hazardous material handling facilities. Any malfunction in software used in these settings could result in dangerous chemical spills, explosions, or environmental disasters.
  • Transportation and Traffic Control Systems: The software should not be used for the control, operation, or management of transportation systems, including railway signal controls, subway systems, or traffic light management. Malfunctions in such critical systems could lead to severe accidents and endanger public safety.
  • Energy Grid and Utility Control Systems: This software is not designed for the control or operation of energy grid systems, including electrical substations, renewable energy control systems, or water utility control systems. The failure of software in these areas could lead to significant power outages, water supply disruptions, or other public utility failures, potentially endangering communities and causing extensive damage.
  • Other High-Risk Environments: Any other critical infrastructure and environments where a failure of the software could result in significant harm to individuals or the environment.

User Responsibility: Users must ensure that they understand the intended use of the software and refrain from deploying it in any setting that falls outside of its designed purpose. It is the responsibility of the user to assess the suitability of the software for their intended application, especially in any scenarios that might pose a risk to life, health, or the environment.

Disclaimer of Liability: Invantive disclaims any responsibility for damage, injury, or legal consequences resulting from the use or misuse of this software in prohibited or unintended applications.

  
Disclaimer