Please enable JavaScript to view this site.

Autotask Forums

Navigation: Schema: TicketCharges > Tables

TicketCharges

Catalog: Autotask

Schema: TicketCharges

This is a read-only table. The Autotask API may not support changing the data or the Invantive UniversalSQL driver for Autotask does not cover it. In the latter case, please use the table NativePlatformScalarRequests to upload data to the Autotask API.

Table Columns

The columns of the table TicketCharges are shown below. Each column has an SQL data type.

Name

Data Type

Label

Required

Documentation

billableAmount

double

Billable Amount

 

billingCodeID

int64

Billing Code ID

 

chargeType

int32

Charge Type

 

contractServiceBundleID

int64

Contract Service Bundle ID

 

contractServiceID

int64

Contract Service ID

 

createDate

datetime

Created

 

creatorResourceID

int64

Creator Resource ID

 

datePurchased

datetime

Purchase Date

 

description

string

Description

 

extendedCost

double

Extended Cost

 

id

int64

ID

 

internalCurrencyBillableAmount

double

Internal Currency Billable Amount

 

internalCurrencyUnitPrice

double

Internal Currency Unit Price

 

internalPurchaseOrderNumber

string

Internal Purchase Order Number

 

isBillableToCompany

boolean

Is Billable to Company

 

isBilled

boolean

Is Billed

 

name

string

Name

 

notes

string

Notes

 

organizationalLevelAssociationID

int32

Organizational Level Association ID

 

productID

int64

Product ID

 

purchaseOrderNumber

string

Purchase Order Number

 

soapParentPropertyId_body_canReduce

boolean

 

 

soapParentPropertyId_body_nodeType

string

 

 

soapParentPropertyId_body_type

string

 

 

soapParentPropertyId_canReduce

boolean

 

 

soapParentPropertyId_name

string

 

 

soapParentPropertyId_nodeType

string

 

 

soapParentPropertyId_returnType

string

 

 

soapParentPropertyId_tailCall

boolean

 

 

soapParentPropertyId_type

string

 

 

status

int64

Status

 

statusLastModifiedBy

int64

Status Last Modified by

 

statusLastModifiedDate

datetime

Status Last Modified Date

 

ticketID

int64

Ticket ID

 

unitCost

double

Unit Cost

 

unitPrice

double

Unit Price

 

unitQuantity

double

Unit Quantity

 

 

10-06-2024 18:39 Version 24.1.3-BETA+4689

X

Important Safety and Usage Information

Intended Use and Limitations: This software, developed by Invantive, is designed to support a variety of business and information technology data processing functions, such as accounting, financial reporting an sales reporting. It is important to note that this software is not designed, tested, or approved for use in environments where malfunction or failure could lead to life-threatening situations or severe physical or environmental damage. This includes, but is not limited to:

  • Nuclear facilities: The software should not be used for operations or functions related to the control, maintenance, or operation of nuclear facilities.
  • Defense and Military Applications: This software is not suitable for use in defense-related applications, including but not limited to weaponry control, military strategy planning, or any other aspects of national defense.
  • Aviation: The software is not intended for use in the operation, navigation, or communication systems of any aircraft or air traffic control environments.
  • Healthcare and Medicine Production: This software should not be utilized for medical device operation, patient data analysis for critical health decisions, pharmaceutical production, or medical research where its failure or malfunction could impact patient health.
  • Chemical and Hazardous Material Handling: This software is not intended for the management, control, or operational aspects of chemical plants or hazardous material handling facilities. Any malfunction in software used in these settings could result in dangerous chemical spills, explosions, or environmental disasters.
  • Transportation and Traffic Control Systems: The software should not be used for the control, operation, or management of transportation systems, including railway signal controls, subway systems, or traffic light management. Malfunctions in such critical systems could lead to severe accidents and endanger public safety.
  • Energy Grid and Utility Control Systems: This software is not designed for the control or operation of energy grid systems, including electrical substations, renewable energy control systems, or water utility control systems. The failure of software in these areas could lead to significant power outages, water supply disruptions, or other public utility failures, potentially endangering communities and causing extensive damage.
  • Other High-Risk Environments: Any other critical infrastructure and environments where a failure of the software could result in significant harm to individuals or the environment.

User Responsibility: Users must ensure that they understand the intended use of the software and refrain from deploying it in any setting that falls outside of its designed purpose. It is the responsibility of the user to assess the suitability of the software for their intended application, especially in any scenarios that might pose a risk to life, health, or the environment.

Disclaimer of Liability: Invantive disclaims any responsibility for damage, injury, or legal consequences resulting from the use or misuse of this software in prohibited or unintended applications.

  
Disclaimer